info@acrodont.com | +1 (409)710-3255 | API 650 & API 653 Certified
Richard Liang Wang, CEO and Founder of Acrodont Industrial Group

Richard Liang Wang — CEO & Founder

Richard Liang Wang

Chief Executive Officer & Founder

Richard Liang Wang is the CEO and Founder of Acrodont Industrial Group, providing strategic leadership across petroleum storage tank engineering, construction, and rehabilitation. Under his direction, the company has grown into a trusted name in above-ground storage tank construction for the oil, gas, and fuel distribution industries.

Edwin leads with an unwavering commitment to technical excellence and safety — ensuring every tank leaves our sites certified, tested, and built to outlast its design life. His background spans API 650 tank engineering, SPCC compliance, full terminal development, and API 653 tank rehabilitation across multiple continents.

API 650 Engineering API 653 Rehabilitation Tank Farm Development SPCC Compliance HSE Leadership 18+ Years Industry
350+
Tanks Constructed
18+
Years in Industry
12
Countries Served
0
Major Safety Incidents

Built on Experience,
Driven by Standards

Acrodont Industrial Group was founded on the belief that the petroleum storage industry deserved a contractor that did one thing and did it extraordinarily well. We have spent years working in the most demanding tank construction environments — remote mining sites, coastal fuel terminals, high-capacity refineries — and every challenge has sharpened our capabilities.

Our founding values of technical integrity, HSE commitment, and client accountability remain unchanged from day one. They are embedded in every weld procedure, every inspection report, and every project handover package we deliver.

A Dedicated Tank
Construction Specialist

From our first API 650 fixed-roof tank, we have grown our scope to cover the full lifecycle of petroleum storage infrastructure — new construction, floating roof systems, full terminal development, API 653 inspections, and environmental containment works.

Our team includes API-certified tank inspectors, certified welding inspectors (CWI), mechanical engineers, and corrosion specialists. Over half of our senior technical staff have been with Sonecas for more than a decade — a level of loyalty and consistency that is rare in the industry.

Key to Our Success

Engineering the Right Solution First

Before any steel is cut, our engineers review your site conditions, product characteristics, and regulatory requirements — ensuring the tank design is optimised for performance, safety, and longevity from the start.

Unmatched Specialist Experience

Our field personnel collectively hold hundreds of years of petroleum tank construction experience. Every weld is carried out by certified welders; every inspection by API-certified inspectors. No shortcuts, ever.

Delivering on Every Commitment

On-time. On-budget. On-spec. Our project controls team tracks every milestone against the programme, and our single point of accountability model means you always know exactly who to call.

Exceeding Client Expectations

We measure success by what our clients say after handover — not just at ribbon-cutting. Our repeat client rate reflects a standard of workmanship and service that consistently surpasses expectations.

Our Core Values

Safety First
Integrity
Technical Excellence
Accountability
Environmental Respect
Client Loyalty

Ready to Work With Our Team?

Get in touch and let's discuss your petroleum storage tank requirements.

Contact Us Today